Solar park and energy infrastructure

Platform · Energy

Power planned with the compute load

Solar generation, battery storage and distribution are specified as part of the facility — so energy is not an external afterthought to dense GPU demand.

On-site generation

Design intent includes a dedicated solar park sized with campus demand scenarios. Capacities remain indicative until engineering and permitting lock scope.

BESS buffering

Battery energy storage smooths intermittency and supports controlled duty cycles for compute. Storage is co-planned with power electronics and facility distribution.

Distribution and grid

Internal MV/LV distribution, redundancy and grid interconnection are part of the energy workstream. No assumption of unlimited public-grid capacity without diligence.

Procurement context

Power and BESS appear as indicative lots in the preparatory procurement notice. Listing a lot is not a live solicitation.